How is the quality of Evergrande Yujingwan? Popular topics and structured analysis of the entire network in the past 10 days
Recently, the quality of housing in Evergrande Yujingwan has become a hot topic on the Internet. This article combines the public opinion data of the entire network in the past 10 days, and analyzes the quality status of the project in a structured way from the perspectives of owner feedback, third-party evaluation, and industry comparison.
1. Distribution of hot topics across the entire network (last 10 days)

| topic type | Proportion of discussion volume | Main points of dispute |
|---|---|---|
| House leakage problem | 32% | Bathroom/balcony waterproofing is not up to standard |
| Decoration materials dispute | 25% | Hollow floors and cracked walls |
| Delay in supporting facilities | 18% | Children's playground/fitness facilities are not yet completed |
| Property service evaluation | 15% | Slow response to repair reports |
| Greening compliance status | 10% | Vegetation survival rate is low |
2. Key data on quality complaints
| Problem classification | Number of complaints (example) | Buildings appear frequently |
|---|---|---|
| Hollow wall | 87 | 5#, 9#, 12# |
| Poor sealing of doors and windows | 63 | 3#, 7# |
| Floor heating pipe leaking | 41 | 8#, 11# |
| Elevator failure | 38 | 2#, 6# |
| Circuit design defects | 29 | 1#, 4# |
3. Third-party testing comparison
The results of a random inspection of 10 finely decorated houses by a professional house inspection agency showed:
| Test items | Qualification rate | industry average |
|---|---|---|
| waterproofing project | 65% | 92% |
| Tile paving | 78% | 95% |
| circuit safety | 83% | 97% |
| Door and window installation | 71% | 89% |
| Environmental protection indicators | 88% | 94% |
4. Excerpts from owners’ true evaluations
1.@sunshinecoast: "When we took possession of the house, we discovered three penetrating cracks on the wall of the master bedroom. The repairs took two months and have not been resolved."
2.@清风雪来: "The floor heating pressure test failed. The developer only made surface repairs and was worried about the risks of winter use."
3.@citywalker: "There is a big gap between the greening of the community and the publicity renderings, and the tree survival rate is less than 60%."
5. Developer’s corrective measures
According to Evergrande’s official announcement (updated in November 2023), the following actions have been taken:
| Measure content | Coverage | Completion time limit |
|---|---|---|
| Establish a special maintenance team | All buildings | Implemented |
| Replace waterproofing materials | 5#, 9# priority | Q1 2024 |
| Increase the frequency of elevator maintenance | Buildings prone to breakdowns | ongoing |
| Greening and replanting plan | central landscape area | Spring 2024 |
6. House purchase advice
1. It is recommended to hire a professional home inspector to take over the house, focusing on checking hidden projects such as waterproofing and electrical circuits.
2. Keep image evidence of all quality problems and request the developer in writing to make rectifications within a time limit.
3. Pay attention to the quality complaint channels of the housing and construction department and initiate legal procedures when necessary
Taken together, Evergrande Yujingwan project has obvious construction quality control problems, but the developer has begun systematic rectification. It is recommended that potential buyers make on-site inspections of the rectification effects and make decisions based on the latest owner evaluations.
check the details
check the details